TR

|

ENG

Manisa Indoor Sports Hall

The Olympic Swimming Pool project construction is done under authority of Ministry of Sports at 2015.

The seat capacity of the swimming pool is 3.500 and all type of seats (spectator seats, lodge, protocol, VIP, press lodge with tables) produced with state of art technology.

FLY-101, FLY-102, MOD-101, MOD-502 products used on The Manisa Indoor Sports Hall.